Telford Station New Footbridge, Lifts, and Passenger Concourse – Shropshire

Client: Caxton Midlands Group / Amey

Our works were carried out adjacent to the main dual carriage-way and the live railway line. The Scheme provides improved access between Telford Town Centre and the Train Station.

Birdcages, HAKI Loading Bays and Staircases, stepped, splayed and cantilevered access to various abutments, bridges, and the oval-shaped Central Drum element of the footbridge.  The internal element of this required a designed scaffold that had to be set out meticulously to negotiate the vertical and horizontal steels.