Premier Inn, Hereford
Client: DriBuild
This new 65-bed Premier Inn was constructed with a steel frame ground floor carrying three floors of timber frame above. The completely freestanding, buttressed scaffold required a significant quantity of kentledge that had to be designed onto a tight footprint, and all loaded/unloaded out of hours.
Project Duration: 12 months
Project Value: £3.9 million