Commercial Scaffolding is our ‘tour de force’. Whether it’s new build, refurbishment or maintenance we have a proven track record of delivering the customers’ needs.

  • 10 Jul Birmingham City University, Seacole Building

    Client: GTH Construction Ltd The client needed to install a 500kg hoist to raise materials 14m, but it was not possible to tie anything into the building. And the scaffold needed to be erected in just one weekend. The height of the scaffold untied dictated......

  • 26 Jun Evesham and Pershore Halls at University of Worcester

    Client: Sovereign Group Fully boarded access scaffold to provide access for window replacements on two halls building at the University of Worcester. The scaffolding was erected at a very creditable 55m a day by our 3man Team. Fully debris netted, Heras fenced allround and Contractors......

  • 29 Apr Coventry University, ECB2

    Client: Speller Metcalfe A new four storey ECB2 (Science, Technology, Engineering and Mathematics, STEM) building with linked covered bridge that will connect the new facility to the existing Faculty of Engineering, Electronics and Computing building. Project Duration: 24 months Project Value: £29 ...

  • 17 Apr Old Gymnasium at University of Birmingham

    Client: Willmott Dixon Extensive refurbishment of the 1940’s gymnasium creating office spaces, lecture theatres and teaching spaces. Project Duration: 18 months Project Value: £7 million   ...

  • 22 Mar West Heath Primary School – Birmingham

    Client: Balfour Beatty Adding to our already vast portfolio of new build schools, this SIPS build was secured through Balfour Beatty and will provide a state-of-the-art, and engaging learning environment for students. The designed fully erected free-standing scaffolding with kentledge provided the c...

  • Malvern Scaffolding - Cathedral Square Plaza

    05 Nov Cathedral Square Plaza – Worcester

    Client: Speller Metcalfe Re-development of tired 1970’s shopping centre into 21st century retail and restaurant spaces Project Duration: 18 months Project Value: £20 million...

  • Malvern Scaffolding - Colwall C of E Primary School

    05 Oct Colwall C of E Primary School – Herefordshire

    Client: Kier State-of-the-art school will accommodate 200 pupils providing an engaging learning environment Project Duration: 7 months Project Value: £5.1 million...

  • Malvern Scaffolding - Audley St. George’s Place

    05 Aug Audley St. George’s Place – Edgbaston

    Balfour Beatty 3 new apartment blocks, 3 renovated building, 95 luxury retirement properties Project Duration: 19 months Project Value: £25 million...

  • Malvern Scaffolding - Commercial Scaffolding

    28 Feb Ellerslie Retirement Village – Malvern

    Client: Wates 5 new apartment blocks, 2 renovated buildings, 101 luxury retirement properties Project Duration: 20 months Project Value: £27 million...