Commercial

Commercial Scaffolding is our ‘tour de force’. Whether it’s new build, refurbishment or maintenance we have a proven track record of delivering the customers’ needs.

  • 04 Dec Worcester Bosch Group – Phase Two

    Client: Speller Metcalfe We were pleased to be working with @Speller Metcalfe again on a local project at Worcester Bosch Head Offices. Extensive handrailing to all floors and roof (note the new double standard configuration we implemented across our company in early 2019 in order......

  • 29 Nov Longbridge Technology Park – Office and Research Building, Birmingham

    Client: Barnwood As part of St Modwen’s ongoing £1 billion regeneration of the former British Leyland / MG Rover site, Malvern secured the next commercial phase on site, namely the Office, Research and Development Building at 3 Devon Way It will sit next to 2......

  • 06 Nov Premier Inn, Hereford

    Client: DriBuild This new 65-bed Premier Inn was constructed with a steel frame ground floor carrying three floors of timber frame above. The completely freestanding, buttressed scaffold required a significant quantity of kentledge that had to be designed onto a tight footprint, and all loaded/unloa...

  • 01 Oct University of Birmingham – National Buried Infrastructure Facility (NBIF)

    Client: Balfour Beatty Nicknamed “The Earthquake Centre”, The primary function of the facility required the creation of a 25m x 10m x 6m deep pit. This will eventually incorporate a moveable floor that can simulate subsidence or seismic activity. We worked with Balfour Beatty Ground......

  • 10 Jul Birmingham City University, Seacole Building

    Client: GTH Construction Ltd The client needed to install a 500kg hoist to raise materials 14m, but it was not possible to tie anything into the building. And the scaffold needed to be erected in just one weekend. The height of the scaffold untied dictated......

  • 26 Jun Evesham and Pershore Halls at University of Worcester

    Client: Sovereign Group Fully boarded access scaffold to provide access for window replacements on two halls building at the University of Worcester. The scaffolding was erected at a very creditable 55m a day by our 3man Team. Fully debris netted, Heras fenced allround and Contractors......

  • 29 Apr Coventry University, ECB2

    Client: Speller Metcalfe A new four storey ECB2 (Science, Technology, Engineering and Mathematics, STEM) building with linked covered bridge that will connect the new facility to the existing Faculty of Engineering, Electronics and Computing building. Project Duration: 24 months Project Value: £29 ...

  • 17 Apr Old Gymnasium at University of Birmingham

    Client: Willmott Dixon Extensive refurbishment of the 1940’s gymnasium creating office spaces, lecture theatres and teaching spaces. Project Duration: 18 months Project Value: £7 million   ...

  • 22 Mar West Heath Primary School – Birmingham

    Client: Balfour Beatty Adding to our already vast portfolio of new build schools, this SIPS build was secured through Balfour Beatty and will provide a state-of-the-art, and engaging learning environment for students. The designed fully erected free-standing scaffolding with kentledge provided the c...

  • Malvern Scaffolding - Cathedral Square Plaza

    05 Nov Cathedral Square Plaza – Worcester

    Client: Speller Metcalfe Re-development of tired 1970’s shopping centre into 21st century retail and restaurant spaces Project Duration: 18 months Project Value: £20 million...