Malvern Boys College Sports Hall
Click on an above image to enlarge.
Malvern Boys College Sports Hall
Client
Speller Metcalfe
Construction of new Sports Hall/refurbishment of Function Suite
This project was awarded to Malvern Scaffolding on the back of the ongoing success of the Boarding House construction. The good working relationship we have with all levels of the Speller Metcalfe team, meant planning at an early stage paid off in relation to the fast pace of the site. Our Site Supervisor took on the responsibility of running both sites at Malvern Boys College, with a team of fifteen scaffolders. He consistently hit targets set at the two sites.
Our design team produced various drawings, including those for a scaffold in the swimming pool area, to take the weight of a MEWP (Mobile Elevated Working Platform). Whilst keeping costs down to a minimum, this provided a safe means of access for the internal works.
Scope of works
• 3500m scaffold links
• 400m hand-railing
• Design scaffold to take MEWPs operations
• Ladder access towers
• Birdcage scaffolds
Programme
35 weeks